REOS — Section 6.0
Document Management System
Standardized Project Document Coding Structure & Quality Governance Rules
ORG
RIV
OrganizationDISC
FLS
DisciplineCTR
KSA
Contract / Client TypeLOC
RUH
LocationPRJ
PRJ001
Project CodeDOC
RPT
Document ClassTYP
CRS
Type / SubtypeSEQ
001
SequenceREV
00
RevisionSTAT
IFC
Status6.3 KEY DEFINITIONS (EACH SEGMENT)
01
- RIV:RIVKSON
02
- GOV:Governance
- PMO:Project/PMO
- TEC:Technical Engineering
- FLS:Fire & Life Safety
- HSE:Health & Safety
- COM:Commercial/Contracts
03
- • KSA: Saudi operations (or client category)
- • Optional client abbreviation (e.g. NEOM, RSG) (only if approved)
04
- RUH:Riyadh
- JED:Jeddah
- DMM:Dammam
- NEOM:Neom
- OTH:Other
05
- • Client project code or RIV internal (e.g. PRJ001)
06
- MNL:Manual
- PRC:Procedure
- PLN:Plan
- RPT:Report
- CAL:Calculation
- DRW:Drawing
- MAT:Matrix
- REG:Register
- FRM:Form
- LTR:Letter
- MIN:Minutes
07
- COMP:Compliance
- RISK:Risk
- GATE:Gate
- RFI:RFI
- CRS:CRS
- NCR:NCR
- CAPA:CAPA
- SUBM:Submission
08
- • 3-digit incremental number (001, 002, 003 …)
09
- • 00, 01, 02 … (Revision changes when content changes)
10
- WIP:Work In Progress
- IFR:Issued For Review
- IFA:Issued For Approval
- IFC:Issued For Construction
- ASB:As-Built
- FIN:Final
6.4 CODING RULES
One code = one controlled record family (never reuse)
Revision changes when content changes
Status changes do not replace revision (status is lifecycle state)
External issue allowed only at IFA / IFC / ASB / FIN per rules
Safety-critical documents require Verified By field before IFC
DOCUMENT LIFECYCLE (STATUSES)
WIP
Work In ProgressIFR
Issued For ReviewIFA
Issued For ApprovalIFC
Issued For ConstructionASB
As-BuiltFIN
FinalEXTERNAL ISSUE (PER RULES)
WIP
IFR
IFA
IFC
ASB
FIN
QUICK REFERENCE EXAMPLE
RIV-FLS-KSA-RUH-PRJ001-RPT-CRS-00-001-IFC
- RIV:Organization (RIVKSON)
- FLS:Discipline (Fire & Life Safety)
- KSA:Contract/Client Type (Saudi Operations)
- RUH:Location (Riyadh)
- PRJ001:Project Code
- RPT:Document Class (Report)
- CRS:Type / Subtype (CRS Report)
- 001:Sequence Number
- 00:Revision Number
- IFC:Status (Issued For Construction)
Scan for DMS & Document Control GuidelinesThis coding system ensures consistency, traceability, and control across all RIVKSON projects and disciplines.
Have a Project in Mind?
Discuss your engineering, fire and life-safety requirements with our team. Your enquiry will be directed immediately to the relevant technical specialist.
Discuss Your Project